Electrical & Instrument
We are specialised in Engineering, Design, Installation, Commissioning and maintenance of Electrical Power and Instrument System. Covering most area of Offshore platforms, onshore plants (Oil & Gas, Power plant Industries), etc. Starting this business services on 2001, we have complete facilities and resources to support the full solutions to your electrical and instrumentation problems.
Our Electrical services covering :-
- High/Medium/Low Voltage Power System
- Cabling Work ( Laying, glanding ,termination and Testing)
- Panel for Switch gear, Transformer, Main Switch Board ,Distribution Board, , etc services
- Indoor and Outdoor Lighting and fittings included ZONE 1 and 2.
- UPS System
- Eexe,Eexd and Wheather proof Junction Box.
- Fabrication Work for Support/Bracket for Electrical Equipment.
- Busduct Cast Resin Type.
- Retrofit work for Switch Gear and MCC panel.
Our Instrument services covering :-
- Field instrumentation installation and calibration (All Type of field Devices )
- Panel and Junction Box installation, wiring and fabrication
- Turbine control panel upgrade
- Cabling Work ( Laying,glanding,termination and testing )
- Fabrication Work for Support/Bracket for instrument Equipment.
- Tubing and fittings design and installation.
We are also specialised in cable specification and coding to suite your application purpose.
Item | Work Description | Customer Information | Completion Date |
---|---|---|---|
1 | Supply, Install MSB, DB’s and Feeder Pillars for Petronas Fire Fighting Training Ground Paka | Petronas KLCCB | March 2000 |
2 | Provision of Manpower, Equipments and Consumables For Replacement and Upgrading of Faulty Explosion Proof Lighting at Tiong-B Platform.(P2/SO/F109) | Petronas Carigali Sdn. Bhd-PMO | August-September 2002 |
3 | Electrical Works at Sek Men Keb Agama Kuala Abang, Dungun | JKR | Oct 2003 – Feb 2004 |
4 | Upgrade of electrical and wiring systems at Sek Keb Nering in Kuala Berang | JKR Letrik | August 2003 |
5 | Upgrading Of UPS For Fire And Gas System At PM 9 To Provide Manpower & Materials At Tinggi-A & Tiong-A. | Starr Kris Services Sdn.Bhd. | December 2004 |
6 | Provision of Upgrading of Fire & Gas at PM-9 Platforms-Bekok A,B & C Provision of Upgrading of Fire & Gas at PM-9 | Platforms-Bekok A,B & C | October 2004 – December 2005 |
7 | Provision of Upgrading of Fire & Gas at PM-9 Platforms-Tiong A & Tinggi A | Petronas Carigali Sdn Bhd | October 2004 – December 2005 |
8 | Supply,Install,Test and Commision of 2 Unit of Stork Centrifugal Pumps For Diesel + Petrol to Petronas GPP B. | Petronas Gas Berhad | August 2000-December 2000 |
9 | Proposed Upgrading of the Compound light at Bachelor Married Flats Rantau Petronas Kerteh. | PWPT | September 2005 |
10 | Kerja-kerja Kejuruteraan Elektrik di menara pengawal pantai Kerteh Port. | Kerteh Port | September –December 2005 |
11 | Upgrade of DB at GAC building Petronas Gas Berhad – GPPA | GPP-A | Feb 2006 – April 2006 |
12 | Penyelenggaraan Elektrik untuk Sekolah Kebangsaan Pengkalan Ranggon. | JKR | July 2006 – September 2006 |
13 | To supply, Installation & Commissioning of Emergency Stop Button / Remove LED Indicator for Smoke Detector/FD @ CXTP | VASTALUX/MRE/PCSB | July 2006 – December 2006 |
14 | Pendawaian Semula Elektrik & Keja-kerja berkaitan di SK Seri Paka, SK Paka & SK Paka II. | JKR Elektrik | July 2006 – September 2006 |
15 | Penyelenggaraan Elektrik untuk SK Pengkalan Ranggon, Kerteh. | JKR Elektrik | July 2006 – September 2006 |
16 | Pengubahsuaian dan Menaiktaraf kerja-kerja Mekanikal dan Elektrikal yang merangkumi Peralatan High Tension Peralatan High Tension, Capacitor Bank, AMF Board dan Kerja-kerja berkaitan di Primula Beach Resort Kuala Terengganu. | PTB Resort Sdn Bhd | August 2006 – October 2006 |
17 | To troubleshoot and repair existing panel c/w cable laying. Performed thermography scan | PTB Resort Sdn Bhd | September 2006 |
18 | Supply, install and calibrate MCCB and MK 1000 protective relay | PTB Resort Sdn Bhd | September 2006 |
19 | Supply, Install, Termination and Testing of Electrical cable from new Auto Change Over Switch Panel to MSB, AMF Board and EMSB. | PTB Resort Sdn Bhd | September 2006 |
20 | Supply, Install, Termination and Testing of Electrical cable from MSB to new Capacitor Bank Panel including 1000A MCCB. | PTB Resort Sdn Bhd | September 2006 |
21 | To change the MSB and SSB for Ground floor and first floor at the Garden Wing. To replace low insulation resistance sub-main cable. | PTB Resort Sdn Bhd | September 2006 |
22 | To change the existing Earth Fault & Overcurrent Relay. | PTB Resort Sdn Bhd | October 2006 |
23 | To install surge protection device | PTB Resort Sdn Bhd | October 2006 |
24 | To change the Switch Fuse type breaker to MCCB type breaker. | PTB Resort Sdn Bhd | October 2006 |
25 | To replace 3000A Air Circuit-Breaker (ACB) -3000A 3pole ACB, Merlin Gerin -SPAJ Protection Relay, ABB -Panel, Internal wiring, Busbar, etc. Site Installation, testing & commissioning. | PTB Resort Sdn Bhd | October 2006 |
26 | To replace 3000A Coupler -3000A 4pole Coupler ACB c/w Castell Keylock -Panel, Internal wiring, Busbar, etc. Site Installation, testing & commissioning. | PTB Resort Sdn Bhd | October 2006 |
28 | Troubleshoot of existing SSB panel (AHU Panel) | PTB Resort Sdn Bhd | October 2006 |
29 | Provision of Tool Room Electrical Work | BP Petronas Acetyls Sdn Bhd | November 2006 |
30 | Provision for the Laying Audio Cabling | BP Petronas Acetyls Sdn Bhd | November 2006 |
31 | Provision of Supply, Installation, Testing and Commissioning of Standby Generator Set and Capacitor Bank for Petronas Dagangan Berhad. | Petronas Dagangan Berhad | March 2007 – April 2007 |
32 | Provision of Electrical and Fire Fighting Systems Maintenance Services at Petronas Operation Complex (KOP) for Petronas Carigali Sdn Bhd-PMO. | PCSB-PMO | March 2007 – February 2009 |
33 | Provision of Supply manpower, Tools, and Material for Electrical work and services, PA System and Telephone Services for the Renovation of GAC Building and Ex-Knu Building at GPP-A | Hadgente Design Sdn Bhd/PGB-GPPA | March 2007 –August 2007 |
34 | Provision of Supply and Install All the Equipment & Accessories for the Street Lighting Project at BASF Services (M) Sdn Bhd, Kawasan Perindustrian Gebeng, Kuantan. | Lebak Engineering Sdn Bhd/BASF | March 2007 – December 2007 |
35 | Provision of Engineering, Procurement, Construction and Commissioning (EPCC) of Concrete Pavement, Structural and Electrical Upgrade Works at LPG Filling Plant, Kerteh, Terengganu – PDB | MRH Construction & Services Sdn Bhd/MRE/PDB | November 2007 – December 2007 |
36 | Provision of replacement 11KV High Fusing Unit & Oil Link Unit with Vacuum Circuit Breakers and Accessories at the Bomba Sub Station, GPPA, Kerteh, Terengganu. | Petronas Gas Berhad | December 2007 – January 2008 |
37 | Provision of Lay New Cable from MRR to K470 at Ethylene | Ethylene (M) Sdn Bhd | February 2008 |
38 | Provision of upgrading Fire Notification System at BPCM,Gebeng. | Tanjung CSI Sdn Bhd | March 2008-July 2008 |
39 | Upgrading works for admin building at Kuantan Bulk Depot,Tanjung Gelang,Kuantan. | Petronas Dagangan Berhad | March 2008-April 2008 |
40 | Membekal tenaga kerja, peralatan, jentera dan yang berkaitan dengannya bagi memasang 2 unit meter control starter panel. | Kilang Sawit Panji Alam Sdn Bhd | July 2008 |
41 | Provision of Supply , Install, Commission Bus Coupler at Petronas Penapisan (T) Sdn Bhd. | Petronas Penapisan (T) Sdn Bhd | September 2008- September 2009 |
42 | Provision of TMR upgrading system project at GPP 5 | Tanjung CSI Sdn Bhd | November 2008 – May 2010 |
43 | Provision Of Upgrading Of Circuit Breaker (Acb) For Erb West And Samarang Platforms For Petronas Carigali Sdn Bhd-Sabah Operation- (Pcsb-Sbo) | Petronas Carigali Sdn Bhd-SBO | March 2009 – December 2010 |
44 | Provision of Electrical Cabling & Wiring Works (Emergency Lighting Replacement Project) at PGB. | Petrogas Gas Berhad | July 2009 – March 2010 |
45 | Provision of Supply & Install of FGS System Devices at MLNG1 | Tanjung CSI/MLNG | January 2010 –November 2011 |
46 | Provision to Upgrade Motor Control Centre (MCC) 2 & 3 at Tembungo – A Platform for PCSB-SBO. | Petronas Carigali Sdn Bhd-SBO | July 2010 |
47 | Provision of Electrical and Fire Fighting Systems Maintenance Services at Petronas Operation Complex (KOP) for Petronas Carigali Sdn Bhd-PMO. | PCSB-PMO / MRE | August 2010 – July 2013 |
48 | Provision of Supply, Install, Testing & Commissioning of Undistruptable Power Supply(UPS). | Tanjung Newenergy/PCSB-PMO | December 2010 |
49 | Provision to Supply, Deliver, Testing & Commission of Three(3) New Power Transformers for Duyong Platform for PCSB-PMO. | MRE/PCSB-PMO | May 2010 |
50 | Provision of Revamp Distributed Control System at TCOT & OSC. | Tanjung CSI/PCSB-PMO | January 2011 – Feb 2013 |
51 | Provision for SIS Upgrading at Bayan Platform | Trisystem | February 2011 – October 2012 |
52 | Guntong-D (GUD) Fuel Gas Superheater Upgrade Project | Ranhill WorleyParsons/EMEPMI | April 2011 – March 2013 |
53 | Provision of manpower and Equipment for Electrical Protection Relay Calibration During MOPU. | PETROFAC | March 2012 – November 2012 |
54 | Supply, Installation, Modification and Commissioning of Busduct System – IBA | Ranhill WorleyParsons/EMEPMI | June 2012 – July 2013 |
55 | Retrofication and Modification of LV Switchgear, MCC & Distribution Panels – IBA | Ranhill WorleyParsons/EMEPMI | June 2012 – July 2013 |
56 | Modification of Switchgear and MCC Termination – Semangkok A | Ranhill WorleyParsons/EMEPMI | June 2012 – Feb 2014 |
57 | To Supply and Install Site Office for GPPA & GPPB c/w Electrical and Mechanical Works. | MRE/SHINRYO | July 2012 – March 2013 |
58 | Supply and deliver of LV Cast Resin Busduct strictly in accordance with the requirements of PO | Ranhill WorleyParsons / EMEPMI | January 2013 – December 2014 |
59 | Gatir project : Package System Upgrade For Pulai-A Centaur 40 Compressor Package. | DELEUM SERVICES | Jan. 2013 – March 2013 |
60 | Upgrading 415V Switchboard for Non-Process area at Petronas Gas Berhad, GPPA, KERTEH. CONTRACT NO.: SMSO/C3/RFX 6200055300 (S130593) | MRE / PGB | Feb. 2014 – Aug 2014 |
61 | TURBINE CONTROL PANEL UPGRADE AT SAMARANG PLATFORM_REV02 | SEDIA TEGUH SDN BHD | April 2014 – Sept 2014 |
62 | PROCESSED PO-60000239-GPP4 SUBCONTRACOR SERVICES T199 (DSSB-PROJECT) | DELEUM SERVICES | May 2014 – May 2015 |
63 | GATIR Upgrading works at Tiong-A 2 X C40PSU | DELEUM SERVICES | May 2014 – January 2015 |
64 | PROVISION OF SUPPLY AND DELIVERY WORK STUDIO FOR PCSB-PMO. | PETRONAS CARIGALI SDN BHD – PMO | June 2014 – August 2014 |
65 | ANGSI CABLE REPLACEMENT”,PETRONAS CARIGALI SDN BHD | - PMO | June 2014 – December 2014 |
66 | PROVISION FOR ENGINEERING, PROCUREMENT, CON STRUCTION, INSTALLATION AND COMMISSIONING (EPCIC) FOR PROTECTION RELAY UPGRADE AT PSCB-PMO – DULANG & DUYONG. | PETRONAS CARIGALI SDN BHD – PMO | July 2014 – on going |
67 | ONSHORE SLUG CATCHER FOR OSC | EXACT AUTOMATION SDN BHD | July 2014 – May 2015 |
68 | PROPOSAL FOR FIRE & GAS AT TERENGGANU CRUDE OIL TERMINAL (TCOT) | EXACT AUTOMATION SDN BHD | August 2014 – Ongoing |
69 | PROVISION OF SUPPLY AND DELIVERY WORK STUDIO FOR PCSB-PMO | PETRONAS CARIGALI SDN BHD – PMO | November 2014 – February 2014 |
70 | ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NGU2 SECOND FEEDER PROJECT AT UTILITIES PLANTS GEBENG (UG) PETRONAS GAS BERHAD | PETRONAS GAS-GPU | September 2014 – on going |
71 | THE PROVISION OF ELECTRICAL SERVICES AND MAINTENANCE AT INSTEP CAMPUS. | INSTEP | April 2015 – 2018 |
72 | SUBCON WORK FOR PROVISION, CONSTRUCTION SERVICES FOR RETROFITTING WORKS FOR TURBOTRONIC 4 UPGRADING PROJECT AT HELANG OFFSHORE PLATFORM T208 JNOEX HIP CTRL & PACKAGE 2XC40GS | DELEUM | May 2015 |
73 | SUBCONTRACTOR SERVICES FOR DUYONG SYSTEM | DELEUM | July 2015 |
74 | ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF HRSG IGNITER SYSTEM AT UTILITIES GEBENG (UG) -PGB GEBENG | PGB-GEBENG | July 2015 |
75 | PROVISION FOR SUPPLY, INSTALLATION AND COMMISSIONING OF AIR CIRCUIT BREAKER (ACB) FOR PCSB-PMO. | PCSB-PMO | Sept. 2015 |
76 | PROCUREMENT, INSTALLATION & COMMISSIONING OF 200KW MCC WITH EXTERNAL JB FOR AIR COMPRESSOR (PORTABLE UNIT) AT GAS PROCESSING PLANT COMPLEX B | PGB | Oct. 2015 |