Vibration Monitoring System
We are appointed local agent for Bently Nevada, US based company for vibration and condition monitoring systems. Our company is one of the supplier of Bently Nevada products consists of:
- Machinery Management Software
- Machinery Management Data Acquisition Devices
- Machinery Protection Systems
- Transducers
Currently we have established Bently Nevada Services Contract with a few clients such as Sarawak Shell Berhad/Sabah Shell Petroleum Co, ExxonMobil Exploration & Production Malaysia Inc, Petronas Carigali Sdn Bhd and Talisman Malaysia Limited. Scope under this Services Contract are as follows;
- Bently Nevada equipments annual health check audit and calibration
- Bently Nevada equipments survey, upgrade and recommendations
- Machinery diagnostics services for rotating equipments such as Gas Turbine Compressors, Gas Turbine Generators and Reciprocating Compressors.
- Structure analysis consists of ODS and Finite Element Analysis
We are also provides project base installation for brown field and green field such as Sabah Gas Onshore Terminal, Kebabangan Petroleum Operations Company and Kinabalu platform. Parts of the scope in the project are as follows:
- Bently Nevada System 1 Diagnostics platform software
- Decision Support
- Bently Performance software
- Smart Signal software
- Wireless WireMesh package
We are also performing Condition Based Monitoring program for our clients especially for offshore. Currently we have CBM contract with Talisman for monthly CBM program, where our CBM personnel mobilise to platform to collect vibration data for Balance of Plant machines such as Fin Fan Cooler and Lube Oil Cooler Fan. We are using Snapshot, portable data collector by Bently Nevada to collect vibration data and downloaded into our System 1 database. This database then will be reviewed and analysed by GE MDS engineer, produce Executive Report then submit to client for their further action.
Please visit www.ge-mcs.com for more information.
Item | Customer Information | Work Description | Completion Date |
---|---|---|---|
1 | Petronas Carigali Sdn. Bhd. – Kertih | Vibration Monitoring Upgrade at Tiong A Gas compressor Train-A. Offshore platforms | Feb – April 2002 |
2 | Petronas Carigali Sdn. Bhd. Kertih | Supply, Install, Test and Commission of On-Line Vibration Monitoring at Pulai A Platform. Offshore platform | May – August 2002 |
3 | ExxonMobil Exploration and Production Malaysia Inc. | Provision of Bently Nevada’s Service Representative For Vibration Monitoring Work – FSE278. | October 2002 – January2003 |
4 | Petronas Carigali Sdn Bhd-Sarawak Operation | Provision of Technical Support Services i.e One (1) Technician and One (1) Machine Diagnostic Specialist (MDS) For Bayan GT703 Bently Nevada Vibration Monitoring System, PCSB-Sarawak Operation. | October 2002 – January 2003 |
5 | Petronas Carigali Sdn Bhd | Provision for the Upgrading of Bently of Nevada 7200 Series Vibration Monitoring System At Tiong-A Platform P3/SO/F036 | June 2003 |
6 | Petronas Carigali Sdn Bhd | Provision To Upgrade Vibration System For Solar Centaur Gas Compressor At Tiong-A Platform | December 2003 |
7 | Petronas Carigali Sdn Bhd – SKO | Provision of Bayan A GT-703 Gaslift/Export Compressor Vibration System Retrofit | December 2003 |
8 | Petronas Carigali Sdn Bhd – Kerteh Operations | Provision To Upgrading Of Vibration Monitoring System For Supply Of Hardware, Software & Consumables Installation and Commissioning To Tinggi A. | April 2004 – June 2005 |
9 | ExxonMobil Exploration and Production Malaysia Inc. | Provision To Upgrading Of Vibration Monitoring Equipment/Accessories For Semangkok A. | June – August 2004 |
10 | Petronas Carigali Sdn Bhd – Kerteh | Provision To Upgrading Of Vibration Monitoring System For Turbo Generators at Dulang and FSO | July 2004 – January 2005. |
11 | Tanjung Offshore Services Sdn Bhd / Petronas Carigali Sdn Bhd PMO | Provision of Upgrading Fire and Gas System at Tukau Platform. | September 2006 |
12 | Petronas Carigali Sdn Bhd – SKO | Provision to Upgrade BNGB-WIM P8200/10 Vibration System for Petronas Carigali Sdn Bhd Sarawak Operations (PCSB-SKO) | August 2004 – Oct 2005 |
13 | Petronas Carigali Sdn Bhd – SBO & Petronas Carigali Sdn Bhd – SKO | Provision of Vendor Support Services for Vibration Monitoring System of Rotating Equipment for Petronas Carigali Sdn Bhd – Sabah Operations (PCSB-SBO) and Petronas Carigali Sdn Bhd – Sarawak Operations (PCSB-SKO)-Service Agreement | December 2004 – Sept 2008 |
14 | Petronas Carigali Sdn Bhd – SKO | Provision for the Upgrading of G5600/5610/5620 Alstom Turbo Generators Vibration Monitoring System at BNG-B Platform | February 2005 – June 2008 |
15 | Petronas Carigali Sdn Bhd – Sabah Operations | Provision To Upgrade The Vibration Monitoring System For Three (3) Units Of Solar Gas Turbine At ERB WEST. | April – August 2005 |
16 | Delcom Services Sdn Bhd / Petronas Carigali Sdn Bhd Kerteh | Provision of Upgrade The Vibration Monitoring System for 2 units of Turbo Compressor – Bekok C Compressor | April 2005 – May 2005 |
17 | Petrofac (M-PM304) Ltd. | Provision of Vibration Survey for MOPU Rotating Equipment. | November 2006 – November 2007 |
18 | GE Power Systems/ TNB Kenyir | Provision of Installation Vibration Monitoring System at TNB Hydro Kenyir Project. | July 2007 – August 2007 |
19 | Repsol Oil & Gas Malaysia Limited | Provision of Vibration Monitoring for Block PM-3 CAA and PM-305 – SAA, Bunga Raya A/D/E and Bunga Orkid A.(Service contract) | July 2007 – On Going |
20 | MRE Power Technologies/GE Power Systems | Provision of Installation of Vibration Monitoring System at TNB Kenyir for unit train 1,2,3 & 4. | May 2008 – July 2008 |
21 | Petronas Carigali Sdn Bhd – PMO | Provision to Upgrade Bently Nevada Vibration Monitoring System for Dulang. | May 2008 – December 2008 |
22 | Repsol Oil & Gas Malaysia Limited | Provision of SAA Gas Lift Compressor & Water Injection Pump Structural Vibration Analysis | July 2008 – December 2009 |
23 | Petronas Carigali Sdn Bhd-PMO | Provision of Bently Nevada Vibration Monitoring System Maintenance Services for PCSB-PMO. | July 2007 – July 2009 |
24 | Repsol Oil & Gas Malaysia Limited | Provision of SAA Gas Lift Compressor Parallel Operation and Vibration and Evaluation | March 2009-May 2009 |
25 | Petronas Carigali Sdn Bhd-PMO | Provision of Bently Nevada Vibration Monitoring System Upgrading for TCOT Vapour Recovery Compressors C-270A, C-270B, C-270C and C-270D for PCSB-PMO. | November 2009 – March 2010 |
26 | EMEPMI / Perunding Ranhill Worley Sdn Bhd | Provision of Lawit-A Compressor Restage Projects/Vibration Study | April 2010 – May 2010 |
27 | EMEPMI | Provision of Bently Nevada Vibration Monitoring System & Technical Support | June 2010 |
28 | EMEPMI | Provision for Bently Nevada Vibration Monitoring System Upgrade, Technical Support and Spare Parts | June 2011 |
29 | Petronas Dagangan Berhad | Provision the price Agreement of Vibration Analysis for Pump and Motor at Kerteh Fuel Terminal, Kerteh Aviation Fuel Terminal and Kuantan Fuel Terminal. | May 2011 |
30 | Petronas Cari Gali Sdn Bhd-PMO | Provision to Upgrade Vibration Monitoring System BN System 1 for Gas Compressor at Dulang B Platform. | August 2012 |
31 | Emerson | MCMS Kinabalu for PCSB | March 2010 – September 2010 |
32 | Emerson | KPOC CPBM Package CBMS | April 2011 – June 2012 |
33 | Samsung Engineering | PCSB SOGT CBMS installation | October 2011- December 2013 |
34 | Petronas Dagangan Berhad | PA for Vibration Monitoring & Pump Alignment for Pump and Motor at PDB Eastern Terminals Consist of Kerteh Fuel Terminal, Kerteh LPG, Kerteh Aviation Fuel Terminal and Kuantan Fuel Terminal. | May 2013 |
35 | Petronas Chemical Methanol Sdn Bhd | Provision for CBM Services (Labuan) | April 2014-March 2015 |
36 | Samsung Engineering | ”PCSB TGAST CBMS installation” | September 2014 – Ongoing |
37 | Petronas Carigali Sdn Bhd | SBO S1 Software Upgrading at Erb West Platform | December 2014 – April 2015 |
38 | Petronas Carigali Sdn Bhd-PMO | Provision of Bently Nevada System 1 upgrading with performance and rule pak software for Dulang B Platform | March 2015 – On Going |
39 | Petronas Carigali Sdn Bhd-PMO | Provision of Bently Nevada System 1 software installation for GTC at Resak Platform | April 2015 – On going |
40 | Petronas Dagangan Berhad | Vibration Monitoring & Pump Alignment for Pump and Motor at Bayan Lepas | April 2015 |
41 | Petronas Dagangan Berhad | Vibration Monitoring & Pump Alignment for Pump and Motor at Prai | May 2015 |
42 | Petronas Gas Berhad | Provision of Engineering, Procurement, Installation, Testing & Commissioning Work of New Surge Protection Device (SPD) system at GPP B Tok Arun, Paka. | October 2005 – Mac 2006 |
43 | Petronas Carigali Sdn. Bhd. Kertih | Supply, Install, Test and Commission of On-Line Vibration Monitoring at Pulai A Platform. Offshore platform | May – August 2002 |
44 | ExxonMobil Exploration & Prodtn Mlysia Inc. | Provision and Installation of One (1) Unit On-Line Condition Monitoring System For Semangkok-A FSE244. | October 2002 – January 2003 |
45 | Petronas Gas Berhad GPP-B | The Provision To Construct, Install and Commission On-Line Analyzing Monitoring System For Amine Pump At GPP Complex B(GPP-B) Paka, Dungun, Terengganu. | October 2002 – February 2003 |
46 | Repsol Oil & Gas Malaysia Limited. | Provision Of Vibration Analysis On Export Compressor For BR-A CPP Project. | december 2003 |
47 | Bumiwangsa Sdn Bhd | PM 9 Fire & Gas Upgrading Contract To Supply Cable, Installation Materials And Labour For Erection Works At Tiong-A. | January 2004 |
48 | Bumiwangsa Sdn Bhd | PM 9 Fire & Gas Upgrading Contract To Supply Cable, Installation Materials And Labour For Erection Works At Tinggi-A. | January 2004 |
49 | Petronas Gas Berhad | Price Agreement For The Rental Of Gas Detector (Portable, Personal & Intelligent) For Turnaround At POD, PGB. | April 2004 |
50 | Petronas Carigali Sdn Bhd – Sabah Operations | Provision To Upgrade The Existing Monitoring System For Turbo compressors, K-6360, K-6310 And K-6260 At ERB WEST A Platform. | April 2004 |
51 | Petronas Carigali Sdn Bhd – PMO | Provision of Supply Control Valve & Its Associated Accessories for Dulang C Platform. | May 2004 – October 2007 |
52 | Petronas Carigali Sdn Bhd – PMO | Provision of Supply Control Valve & Its Associated Accessories for Dulang A Platform. | July 2004 – December 2004 |
53 | Petronas Gas Berhad | Price Agreement For The Rental Of Skid Tank Mono ethylene Glycol (MEG) at GPP1. | June 2004 – March 2005 |
54 | ABB | PM 9 Fire & Gas Upgrading Contract To Supply Cable, Installation Materials And Labour For Erection Works At Bekok A, B and C. | June 2004 |
55 | Petronas Carigali Sdn Bhd – PMO | Provision of Supply Control Valve & Its Associated Accessories for Dulang D Platform. | September 2004 – Mac 2005 |
56 | Petronas Gas Berhad | Price Agreement For The Rental Of Gas Detector (Portable, Personal & Intelligent) For Turnaround At POD, PGB. | September 2004 – November 2004 |
57 | Petronas Gas Berhad | Intelligent 4-in-1 Gas Detector – Stand alone | October 2004 |
58 | Petronas Carigali Sdn Bhd – PMO | Provision of Upgrading Five Units of Motor Operated Valve at Bekok C Paltform. | December 2004 – May 2005 |
59 | Petronas Carigali Sdn Bhd – SKO | Provision for On-Line Monitoring System for Two (2) Units Water Injection Pump At BNG-B for Petronas Carigali Sdn Bhd (PCSB-SKO) | February 2005 – October 2005 |
60 | Emerson Process Management | Provision for the Machinery/Asset Condition Management System for Three (3) Turbine Generators and One (1) Turbine Gas Compressor at Baram South Platform | February 2005 |
61 | Petronas Carigali Sdn Bhd – Sabah Operation | Provision of Online Monitoring System for Samarang Gas Turbine Compressor. | July 2005 – On Going |
62 | Repsol Oil & Gas Malaysia Limited | Monthly VMS (BOP Machine) for Block PM-305 South Angsi Field.(Talisman-SAA) | October 2005 |
63 | Repsol Oil & Gas Malaysia Limited | Provision for Monthly VMS (BOP Machine) for Block PM-305 South Angsi Field. (Talisman-SAA) | March 2006 |
64 | ExxonMobil Exploration and Production Malaysia Inc. | Provision for Supply of Bently Nevada parts for EMEPMI’S Operations – Price Agreement | March 2006 |
65 | Petronas Carigali Sdn Bhd – PMO | Provision of Technical Support Condition Based Monitoring (CBM) Services for PCSB-PMO. | November 2006 – November 2009 |
66 | Tanjung Offshore Services Sdn Bhd / Petronas Carigali Sdn Bhd-SBO | Provision of Supply Manpower for the Installation of Siemens Control Panel Retrofit at Samarang Platform. | April 2007 – On Going |
67 | Exact Control Sdn Bhd / Petronas Carigali Sdn Bhd-PMO | Provision of Supply, Installation & Commissioning of Fusible Plug Loop System at Bekok-A Platform. | March 2007 – April 2007 |
68 | Tanjung Offshore Services Sdn Bhd / Petronas Carigali Sdn Bhd PMO | Provision of Upgrading Fire and Gas System at Kepong-A and Tiong-B Platform. | March 2007 |
69 | Petronas Carigali Sdn Bhd – PMO | Provision of Supply, Testing and Commissioning for Bently Nevada Equipment. | March 2007 – April 2007 |
70 | GE Power Systems/Polyethylene | Provision of Conceptual Machine Monitoring System at Polyethylene . | March 2007 – July 2007 |
71 | Centralised Utility Facilities | Provision of Instrument cable modification for TNB Hardwired at CUFK and CUFG. | May 2007 – July 2007 |
72 | Tanjung Offshore Services Sdn Bhd /Petronas Carigali Sdn Bhd PMO | Provision of Installation Fire & Gas System at Tukau Platform – Variation Order. | July 2007 |
73 | SapuraCrest Power Services / Petronas Carigali Sdn Bhd-PMO | Provision of Installation Air Raft for Rolls Royce Allison Pilotless Dual Fuel Nozzle Upgrade at Angsi Platform. | Sept. 2007 – On Going |
74 | Petronas Carigali Sdn Bhd – PMO | Provision of Installation and Upgrading of Citrix Server Application for Tiong-A Bently System 1 Onshore Remote Display. | January 2008 – March 2008 |
75 | Tanjung Offshore Services Sdn Bhd / Petronas Carigali Sdn Bhd SBO | Provision of Fire And Gas Detection System For City Gate Metering Station At Petronas Carigali – SBO. | May 2008 – September 2008 |
76 | Trisystems Sdn Bhd / Petronas Carigali Sdn Bhd – PMO | Provision of Supply Manpower for Installation at Dulang-A, Dulang-B and Dulang-C. | August 2008 |
77 | Petronas Carigali Sdn Bhd- PMO | Provision to Upgrade Bently Nevada at Tiong. (Cable Replacement for Compressor VMS) | September 2008 |
78 | Petronas Carigali Sdn Bhd-PMO | To perform Lube Oil analysis for TM Provision for Lubricating Oil Analysis for All Turbo machinery units for PCSB-PMO. | September 2008 – September 2011 |
79 | Petronas Carigali Sdn Bhd-PMO | Provision to Upgrade Bently Nevada at Tiong. (Cable Replacement for Generator VMS) | February 2009 |
80 | Petronas Carigali Sdn Bhd-SKO | Provision of Health Check Audit of Bently Nevada 3500 Series/System 1 at Baronia, Bayan, D35 and Baram Platform for PCSB-SKO. | February 2009 – February 2010 |
81 | Petronas Carigali Sdn Bhd-SBO | Provision of Health Check Audit of Bently Nevada 3500 Series/System 1 at Samarang and Erb West Platform for PCSB-SBO. | August 2008 – August 2009 |
82 | Tanjung New Energy Service/Petronas Carigali Sdn Bhd-SKO | Provision of Supply, Installation and Commissioning for Reciprocating Online Monitoring System for PCSB-SKO. | April 2009 – On going |
83 | Tanjung CSI/Petronas Carigali Sdn Bhd-SKO | Installation of Fire & Gas for COTP at PCSB-SKO. | July 2009 – On going |
84 | EMERSON/Petronas Carigali Sdn Bhd-SBO | Machine Condition Monitoring System (MCMS) for Kinabalu Project. | July 2009 – On going |
85 | Tanjung CSI/Petronas Carigali Sdn Bhd-PMO | Provision of Installation of Gas Compressor Fire Gas System at Tiong-A. | January 2010 – On Going |
86 | PTT Aromatics & Refining Public Company Limited | Provision of Fire Heaters Emergency Shutdown (ESD) Software Reengineering at PTT Aromatics & Refining Public Company Limited. | March 2010 |
87 | Sarawak Shell Berhad | Provision of Condition and Performance Based Maintenance System for B11K-A, F23VLAP and St.Joseph Redevelopment for SSB/SSPC. | May 2010 – May 2013 |
88 | Delcom Services Sdn Bhd/GPPA | Provision of TT4 UCP Upgrade Project at KCS-A | May 2010 |
89 | Delcom Services Sdn Bhd/Petronas Carigali Sdn Bhd-PMO | Provision of Installation at Dulang-B TCP Upgrade – Construction Works for 3 units of Solar Gas Compressors. | November 2009 |
90 | Newfield Peninsular Malaysia | Provision of Dynamic Design Verification for Two(2) Units of Gas Compressor Module at Newfield's East Belumut-A Platform. | August 2010 |
91 | Petronas Carigali Sdn Bhd-PMO | Provision To Upgrade BN System 1 For Dulang-B Compressor and Water Injection Pump for Petronas Carigali-PMO | October 2010 |
92 | Emerson Process Management | The Supply & Installation of Machine Condition & Performance Monitoring System (CPBM) for KPOC Platform. | February 2011 – On Going |
93 | Turboservices Sdn Bhd | Provision of Installation Tiong-A TCP Upgrade – Construction works for 2 units of Solar Gas Compressor. | May 2011 – October 2011 |
94 | Trisystem Eng.Sdn Bhd | Provision of Relocating Gas Detector at D35 for PCSB-SKO | September 2011 |
95 | Petronas Carigali Sdn Bhd-PMO | Provision of Supply, Installation & Commissioning of Fusible Plug Loop System at Duyong, Dulang, Tinggi and Pulai Platforms and Onshore Gas Terminal(OGT) for PCSB-PMO. | October 2011 |
96 | Berkat Honeywell/Petronas Gas Berhad | Supply of field instrument and installation work for turbo expander Control system R/RT – 401 at GPP3 Gas Processing plat Complex –A GPP-A, Paka , TRG | April 2012 |
97 | Deleum Services/Petronas Gas Berhad | The Engineering, Construction and Installation for Retrofitting Works for Turbotronic 4 Upgrading Project at GPP-2, GPP-A, Kerteh Terengganu. | July 2012 |
98 | Repsol Oil & Gas Malaysia Limited | Provision of Bently Nevada Condition Based Monitoring Services | October 2012 |
99 | Deleum Services | The Engineering, Construction and Installation for TCOT Control Retrofit Project. | November 2012 |
100 | Petronas Carigali Sdn Bhd-SBO | Provision of Vendor Support Services for Vibration Monitoring System of Rotating Equipment for PCSB-SBO | January 2013 |
101 | Petronas Carigali Sdn Bhd-PMO | Provision to Supply and Deliver Fusible Plug Loop Panel & Tubing for Rejuvenation Project at Terengganu Crude Oil Terminal (TCOT) and Onshore Slug Catcher (OSC) for PCSB-PMO. | June 2013 |
102 | Sarawak SHELL Berhad | Provision of Condition and Performance Based Maintenance System for GUMUSUT-KAKAP Field | December 2013 |
103 | Petronas Gas Berhad | Turbomachinery Instrumentation K-501 | July 2014 |
104 | Sarawak Shell Berhad | CPBM TSS – PLA & RCA | August 2014 – on going |
105 | Petronas Carigali Sdn Bhd-PMO | PROVISION OF BENTLY NEVADA CONDITION-BASED MONITORING SERVICES, MACHINE DIAGNOSTICS AND SUPPLY OF SPARES (CONTRACT) – PMO | August 2015 – August 2017 |
106 | Sarawak SHELL Berhad | PROVISION OF BENTLY NEVADA CONDITION-BASED MONITORING SERVICES, MACHINE DIAGNOSTICS AND SUPPLY OF SPARES – SARAWAK SHELL | August 2015 – August 2017 |
107 | Repsol Oil & Gas Malaysia Limited | PROVISION OF BENTLY NEVADA CONDITION-BASED MONITORNG SERVICES, MACHINE DIAGNOSTICS AND SUPPLY OF SPARES(CONTRACT) – TALISMAN | August 2015 – August 2017 |
108 | Petronas Dagangan Berhad | PRICE AGREEMENT OF VIBRATION MONITORING AND ANALYSIS AT PDB EASTERN REGION TERMINALS | Sept. 2015 – Sept. 2017 |